How to Quote Flooring Installation in Australia
Guide for flooring installers on quoting timber, vinyl, laminate, and carpet jobs. Covers per-sqm pricing, underlay, transitions, and subfloor preparation.

What to Include in a Flooring Quote
A flooring quote should cover: flooring product (brand, range, colour), underlay (type and thickness), subfloor preparation (levelling, moisture barrier), transition strips between rooms, scotia or quarter-round around perimeters, removal of existing flooring (if applicable), and furniture moving (if offered). Always specify the total area including waste.
Flooring Costs Per Square Metre in 2026
Hybrid vinyl plank (supply and install): $60–$120/sqm. Engineered timber: $80–$160/sqm. Solid hardwood: $100–$200/sqm. Laminate: $40–$80/sqm. Carpet (supply and install): $50–$120/sqm. Subfloor levelling: $20–$50/sqm additional. These prices include underlay where required.
Subfloor Preparation
Subfloor condition is the most overlooked cost in flooring quotes. Check for: levelness (3mm deviation over 1m is the maximum for most products), moisture (test concrete slabs with a moisture meter), cracks and damage, and existing floor coverings that need removal. Self-levelling compound costs $20–$50/sqm and can make or break a job.
Waste Calculations
Standard installation in rectangular rooms: add 10% waste. Rooms with many angles or hallways: add 12–15%. Diagonal or herringbone patterns: add 15–20%. Always explain the waste factor to the client — they often question why you're ordering more than the measured area. Include this in the quote notes.
Quoting Tips
1. Measure every room yourself — don't trust builder or customer measurements. 2. Check subfloor moisture on concrete slabs. 3. Always include transitions between flooring types. 4. Quote furniture moving as an optional extra. 5. Include a lead time for product ordering — popular colours can take 2–4 weeks.
Pro Tips
- Measure every room yourself — even 5% error on a large area is significant
- Test concrete subfloor moisture before committing to a price
- Include 10–15% waste in your material calculations
- Quote transitions between rooms as individual line items
- Check door clearances — doors may need trimming
- Include product lead time in your quote timeline
Quote This Job in Under 2 Minutes
Skip the spreadsheet. QuoteMate’s AI pulls real-time Bunnings & Mitre 10 prices and generates a professional PDF quote you can send on the spot.
Or try it on the web →Related Template
Related Trade
More Guides
- How to Quote a Bathroom Renovation in Australia
- How to Quote a Deck Build in Australia
- How to Quote a Kitchen Renovation in Australia
- How to Quote a Fence Installation in Australia
- How to Quote Painting a House in Australia
- How to Quote a Concrete Driveway in Australia
- How to Quote a Solar Panel Installation in Australia
- How to Quote a Pergola Build in Australia